Project Overview

Coastal road North Phase, shore  road to weld road, the ongoing installation of 3.5km new filter drain, pipe bedding, and type A and type B filter material.

All designed to improve the drainage of both the land within the SSSI land, the discharge of the high tide and the carriageway surface water.

Project Details

  • Update Date: June 2020
  • Location: Southport, Merseyside
  • Client: Sefton Borough Council