Project Overview The programme of works has been to install override to Braydon Close –week commencing 22nd June excavating existing kerbs and laying new kerbs and edgings on both sides of the central grassed area began. And will be completed by Friday 10th July. Project Details Date: June / July 2020 Location: Liverpool, Merseyside Client:…

Read More

Project Overview The remit was to resurface the bridge to resolve the pot holes on both sides of the bridge. Super flex material was used as this is a harder wearing substance to support an improved safer road structure. Simon Broad site supervisor and his team completed this contract over 4 nights and as can…

Read More

Project Overview The remit of the job was to resurface the yard area due to the ground being pitted with the constant use of the stacker trucks. Simon Broad, Site Supervisor designed the job and used Super flex as this is a harder material which, supports the constant use of the vehicles in and out…

Read More

Project Details Duration: Thirty Four Week Contract Date: June 2004 to March 2005 Value: £1,200,000 Location: Wirral Project Manager: Chris McLoughlin Client: Wirral Borough Council The construction of this carriageway was initially proposed by Wirral B.C. to alleviate the hazardous series of bends in the existing single lane carriageway that ran from Saughall Massie Road…

Read More

Project Details Duration: Three Years Date: 11th January 2000 Value: £7.2m Location: Liverpool Project Manager: Robin O’Mahoney / Peter Allard Client: Liverpool City Council St Peter’s Square was an integral part of the Ropewalks Phase Two contract. This particular section of Ropewalks was originally called the ‘nun’s garden’ but was incorporated as part of the…

Read More

Project Details Duration: 12 Months Date: August 2007 – August 2008 Value: £2.35m Location: Liverpool Project Manager: Neil Hayes Client: Liverpool City Council Covering an area 18,000 square metres, the specialist imported parting from china was brought in by boat via Southampton, and stored at Marshalls depot in Alconbury in Cambridge. The works commenced in…

Read More

Project Details Duration: Twenty Four Week Contract Date: September 1999 – February 2000 Value: £700,000 Location: Liverpool Project Manager: Peter Allard Client: Liverpool City Council This project was the culmination of many years of canvassing and development of the Chinese business community in Liverpool chaired by its president, Mr Brian Wong. At the start of…

Read More

Project Details Duration: Twenty Weeks Date: February 2005 Value: £3.2m Location: Sefton Project Manager: Tony O’Neil Clent: Knowsley Borough Council This contract involved the resurfacing of the M62 motorway between junctions 5 & 6 for Knowsley Borough Council, using foamed bitumen stabilised material (foamix) as the base layer. The cold planning was carried out by…

Read More