Project Overview Coastal road North Phase, shore¬† road to weld road, the ongoing installation of 3.5km new filter drain, pipe bedding, and type A and type B filter material. All designed to improve the drainage of both the land within the SSSI land, the discharge of the high tide and the carriageway surface water. Project…

Read More
resurfacing footpaths and digging groundworks on the coastal road southport

Project Overview Part of the East / West Cycle Link for Sefton MBC, valued at approx. ¬£1.7m, The Coastal Road works involve the removal of the existing filter material and installing over 3000m of 225mm dia pipe, within over 2000t of pipe bedding, over 8000t of Type B material wrapped in a terram 1000 matting,…

Read More