Posts Tagged ‘sefton borough council’
Coastal Road Southport (update)
Project Overview Coastal road North Phase, shore road to weld road, the ongoing installation of 3.5km new filter drain, pipe bedding, and type A and type B filter material. All designed to improve the drainage of both the land within the SSSI land, the discharge of the high tide and the carriageway surface water. Project…
Read MoreFine Janes Brook Southport
Project Overview The ongoing installation of a new 3m wide concrete footway /cycle ways. A length of 600m running behind the Southport Hospital, and connects Scarisbrick New Road and Town Lane. Project Details Date: Ongoing – June 2020 Location: Southport, Merseyside Client: Sefton Borough Council
Read MoreCoastal Road Southport
Project Overview Part of the East / West Cycle Link for Sefton MBC, valued at approx. £1.7m, The Coastal Road works involve the removal of the existing filter material and installing over 3000m of 225mm dia pipe, within over 2000t of pipe bedding, over 8000t of Type B material wrapped in a terram 1000 matting,…
Read MoreFormby By-Pass Resurfacing
Project Overview Simon Broad, Site Supervisor and his team worked on a section of the Formby By-Pass located close to the traffic lights at Tesco (in-bound). Super flex higher PSV was used as this has a higher skid resistance and supports improved safer road structures for all motorists. Project Details Date: April 2020 Location: Formby,…
Read MoreMillers Lane, Bootle, Liverpool (bridge resurface, pot hole repair)
Project Overview The remit was to resurface the bridge to resolve the pot holes on both sides of the bridge. Super flex material was used as this is a harder wearing substance to support an improved safer road structure. Simon Broad site supervisor and his team completed this contract over 4 nights and as can…
Read More