Liverpool TMC15 Contract – Carriageway Surfacing – Abbey Road

Project Details Duration: December 2018 Date: 2018 Value: approximately £20,000 Location: Abbey Road, Liverpool Project Manager: Brian Morrey Client: Liverpool City Council Highway Department Carry out resurfacing works to residential road, including: Cold milling to remove existing road surface; disposal of road planings; Carry out jetting of existing drains & CCTV camera survey; adjustment of…

Read More

Liverpool TMC15 Contract – Carriageway Surfacing – Woodlands Road, Mossley Hill

Project Details Duration: 4 months Date: January – April 2018 Value: approximately £200,000 Location: Woodlands Road, Mossley Hill, Liverpool Project Manager: Brian Morrey Client: Liverpool Council Highway Department Carry out resurfacing works to residential road, including: Cold milling to remove existing road surface; disposal of road planings; Carry out jetting of existing drains & CCTV…

Read More

Manchester TMC040 Footway Reconstruction Schemes

Project Details Duration: Date: 2018 – 2019 Value: approximately £1,000,000 Location: Various location on Manchester Council’s highway network Project Manager: Brian Morrey Client: Manchester City Council Carry out Footway reconstruction works at various locations, including replacement of road kerbs, removal of existing footway paving or surfacing, installing new flexible footway including MOT1, AC20 binder and…

Read More

Dallam & Bewsey Phase 2 Public Realm Improvements – Warrington

Project Details Duration: 6 months Date: 2018 Value: approximately £800,000 Location: Longshaw Street & Hawleys Lane, Warrington Project Manager: Brian Morrey Client: Warrington Borough Council Contract to provide upgraded public realm on Longshaw Street and Hawley Lane, including: Site clearance of existing road kerbs, drainage channels, guardrails, and footway paving. Install new drainage connections, and…

Read More

Manchester TC040 Contract – Carriageway Resurfacing

Project Details Duration: Contract Date: 2016 – 2020 Value: approximately £4,000,000 Location: Manchester Council Highway Network Project Manager: Brian Morrey Client: Manchester City Council Carry out resurfacing works to a large number of residential roads within Manchester council highway network, including: Cold milling to remove existing road surface, disposal of road planings, jetting of existing…

Read More

Highway Maintenance Contract – Liverpool City Council

Project Details Duration: On going Date: Contract commenced 2016 Value: approximately £2,000,000 Location: Merseyside – Liverpool Council Highway Network Project Manager: Brian Morrey Client: Liverpool City Council Provision of patching gangs on an on-going framework order, to carry out road and footpath patch repairs where existing surface has deteriorated and become potholed. Contract includes for…

Read More

New Business Park Link Road – Gilmoss, Liverpool

Project Details Duration: 9 months Date: March 2016 Value: approximately £1,000,000 Location: Merseyside Project Manager: Brian Morrey Client: Amey Highways / Liverpool City Council Construction of new link road as an enabling package for a new business park adjacent to the A580 East Lancs Road, including: General site clearance, new highway drainage and sewer connection,…

Read More

Asc: Term Maintenance Contract

Project Details Duration: 24/7 Contract 52 weeks p/a Date: 2004 – 2011 Value: £1,200,000 Location: Merseyside Project Manager: Brian Morrey Client: Sefton MBC The Sefton ASC7 contract was initially set up as a DSO based annual contract which was exclusively operated by Sefton’s own internal workforce. When the contract was eventually awarded to Dowhigh Ltd…

Read More

Taylor Park Woodland Car Park

Project Details Duration: Eight Weeks Date: May 2012 Value: £124,000 Location: St Helens Project Manager: Chris McLaughlin Client: St Helens Borough Council Taylor Park in St Helens is a well used local amenity, popular with dog walkers, anglers, model boat users, and of course children. The existing car park was oversubscribed, causing overspill into neighbouring…

Read More

Flaxton Square Amphitheatre

Project Details Duration: Fourteen Weeks Date: February – May 2011 Value: £80,000 Location: Skelmersdale Project Manager: Brian McGarry Client: West Lancs Borough Council Flaxton Square Amphitheatre is a community inspired resource, which was Lottery funded and constructed by Dowhigh Limited under the direction of West Lancashire Borough Council. The area was previously a neglected and…

Read More