Saughall Massie Road

Project Details Duration: Thirty Four Week Contract Date: June 2004 to March 2005 Value: £1,200,000 Location: Wirral Project Manager: Chris McLoughlin Client: Wirral Borough Council The construction of this carriageway was initially proposed by Wirral B.C. to alleviate the hazardous series of bends in the existing single lane carriageway that ran from Saughall Massie Road…

Read More

Ropewalks Phase 2 – St Peters Square

Project Details Duration: Three Years Date: 11th January 2000 Value: £7.2m Location: Liverpool Project Manager: Robin O’Mahoney / Peter Allard Client: Liverpool City Council St Peter’s Square was an integral part of the Ropewalks Phase Two contract. This particular section of Ropewalks was originally called the ‘nun’s garden’ but was incorporated as part of the…

Read More

Liverpool Echo Arena

Project Details Duration: 12 Months Date: August 2007 – August 2008 Value: £2.35m Location: Liverpool Project Manager: Neil Hayes Client: Liverpool City Council Covering an area 18,000 square metres, the specialist imported parting from china was brought in by boat via Southampton, and stored at Marshalls depot in Alconbury in Cambridge. The works commenced in…

Read More

Lymm Town Centre

Project Details Duration: Twenty Five Week Contract Date: Commenced 20th February 2009 Value: £786,000 Location: Lymm Category: Building, Architecture Project Manager: Roy Hankay Client: Warrington Borough Council The contract was initially split into two phases, Cherry Lane surfacing, which involved the closure of the main carriageway from the motorway into the heart of the village,…

Read More

Thurstaston Crossroads Phase 2 Roundabout Scheme

Project Details Duration: Thirty Weeks Date: 2009 to April 2010 Value: £300,000 Location: West Wirral Project Manager: Chris McCloughlin Client: Wirral Borough Council This high-profile West Wirral crossroads had become a notorious accident black spot as well as a political hot potato. Keeping the main access road open, the planning and phasing of this project…

Read More

Ropewalks Phase 1 – Chinese Arch

Project Details Duration: Twenty Weeks Date: February 2005 Value: £3.2m Location: Sefton Project Manager: Tony O’Neil Clent: Knowsley Borough Council This contract involved the resurfacing of the M62 motorway between junctions 5 & 6 for Knowsley Borough Council, using foamed bitumen stabilised material (foamix) as the base layer. The cold planning was carried out by…

Read More

M62 Junction 5 and 6

Project Details Duration: Twenty Weeks Date: February 2005 Value: £3.2m Location: Sefton Project Manager: Tony O’Neil Clent: Knowsley Borough Council This contract involved the resurfacing of the M62 motorway between junctions 5 & 6 for Knowsley Borough Council, using foamed bitumen stabilised material (foamix) as the base layer. The cold planning was carried out by…

Read More