Category Archives: Highways
Case Study – Warrington Borough Council – Omega
For a number of years, Warrington Borough Council have been working on a significant highway [...]
May
Case Study – Lea Green Footways (St Helens)
Between January 2022 and March 2022, St Helens Metropolitan Borough Council embarked on a footway [...]
May
Case Study – A565 North Liverpool Key Corridor
The North Liverpool Key Corridor (NLKC) scheme began work on site in spring 2017. This [...]
May
M62 Lane 1 Resurfacing (Completed)
Work is now complete on the M62 lane 1 between junctions 4 and 5 eastbound. [...]
Aug
M62 Lane 1 Resurfacing
Dowhigh will be resurfacing lane 1 of the M62 between Monday 20th June and Wednesday [...]
Jun
A565 Cambridge Road, Southport – Roundabout (Carriageway Inspection)
Client: Sefton CouncilCompletion Date: 2015Duration: 2 monthsLocation: Cambridge Road, Southport, Merseyside Project Overview A565 Cambridge [...]
Mar
Manchester TC040 Contract – Traffic Calming Measures
Client: Manchester City CouncilCompletion Date: 2019Duration: Location: Manchester network Renewal of traffic calming measures within [...]
Mar
Devon Doorway Roundabout
Client: Wirral Borough CouncilCompletion Date: March 2009Duration: 1 weekLocation: Wirral, Merseyside One of the Wirral’s [...]
Mar
Saughall Massie Road
Client: Wirral Borough CouncilCompletion Date: March 2005Duration: 34 weeksLocation: Wirral, Merseyside The construction of this [...]
Mar
Lymm Town Centre
Client: Warrington Borough CouncilCompletion Date: August 2009Duration: 25 weeksLocation: Lymm, Warrington The contract was initially [...]
Mar
- 1
- 2